A 3D drawing describes the finished part. A quote commits a workshop to a price for making it. Between the two sit a surprising number of decisions: which machine to use, how long it takes to set up, what quantity the customer actually wants and what happens if the material price changes before the order arrives. An estimator can save time on a calculation and still make an expensive promise.

EIST, a small metal fabrication business in Lyon, offers a useful example. Its director told France Num, the French government's digital programme for businesses, that some quotations used to take two hours to prepare. The firm linked 3D files to past production records and cleaned up its ERP data and bills of materials. It now reports preparing a quote in about ten minutes. Those timings come from the business. The public account does not tell us how well the system performs on a part unlike anything in its history. That is a question another workshop can test before adopting the approach.

Consider a fictional order for twelve stainless-steel brackets. An earlier order used the same outline but a different grade of steel. The old job offers evidence about bends and setup. Its material cost needs a current purchase price. If the estimator copies the total from the earlier quote, nobody reviewing the final figure can see which assumption came along with it. A draft broken into setup, production time, material and margin gives the reviewer a chance to catch it.

There is a simple trial a small team can run before letting estimates reach customers. Set aside completed jobs that were never used to configure the estimator. Give it only what the workshop knew when each customer first asked for a price. Keep the invoice and actual production time out of sight until after the estimate is recorded. Include a repeat order, a material substitution and an unfamiliar part. For each one, inspect the largest discrepancy in euros and the assumption that caused it. An average across the three can hide the order on which the workshop loses money.

Keep one column for decisions that still need a name against them. Who confirms the material grade? Who checks the supplier's current price? Who is authorised to quote when there is no comparable job? Even an empty field can improve a draft if the alternative is a plausible-looking number with no basis. Record how long the human review takes as well as how long the software runs. That gives the next workshop a result it can compare with its own process.

Source: France Num's published interview with EIST, https://www.francenum.gouv.fr/guides-et-conseils/intelligence-artificielle/analyse-et-exploitation-des-donnees-metiers-avec-lia-7